Location: The Pheasant Inn ,Bassenthwaite
Client: Metnor Construction
Duration: 25 weeks
The Pheasant Inn ,Bassenthwaite, originally a Lakeland staging post and coaching inn, is a unique place that combines outstanding hospitality and local character in a simply breathtaking setting. It has recently been internally refurbished.
J W was awarded the contract for the soft strip demolition,temporary works and groundwork’s,work on the project commenced in March 2020 and completed in September 2020.
Our demolition, soft-strip demolition, asbestos removal and groundworks will be carried out in accordance with HSE legislation and Guidance. The works will also be carried out in accordance with all procedures within the standard procedures for work. We are fully accredited for all of the works we do and you can rest assured that it will be carried out to the highest possible standards.
Get in touch today on 07891 556 065 or contact us